Metric_Group,Asset_or_Benchmark,Geography,Value_1,Value_2,Unit,Classification,Source_Note Rock_Reserves,Morocco Phosphate Rock Reserves,Morocco,50000,68.5,Million_Tonnes_and_Percent,Observed,USGS MCS 2025 (50B t out of ~73B t global) Rock_Reserves,China Phosphate Rock Reserves,China,3400,4.7,Million_Tonnes_and_Percent,Observed,USGS MCS 2025 (3.4B t) Rock_Production,China Marketable Phosphate Rock,China,110,44.0,Million_Tonnes_and_Percent,Observed,USGS MCS 2025 (~110 Mt of ~250 Mt world) Rock_Production,Morocco Marketable Phosphate Rock,Morocco,36,14.4,Million_Tonnes_and_Percent,Observed,USGS MCS 2025 (~36 Mt) Rock_Production,United States Marketable Phosphate Rock,United States,20,8.0,Million_Tonnes_and_Percent,Observed,USGS MCS 2025 (~20 Mt) LFP_Scale,China LFP Cathode Shipments (2025 vs 2026 Pace),China,3.94,6.00,Million_Tonnes_LFP_CAM,Observed,2025: 3.94 Mt (79.1% share); H1 2026: 2.73 Mt (>6 Mt pace) LFP_Share,China Monthly Power Battery LFP Share (Oct 2026),China,85,87,Percent_Installations,Observed,CnEVPost Nov 2026 battery installation tracking Ex_China_Asset,OCP Group EMAPHOS PPA Plant (Jorf Lasfar),Morocco,300000,100,Tonnes_PPA_and_Pct_Ownership,Observed,OCP move to 100% ownership of 300 kt/yr PPA facility Ex_China_Asset,COBCO Integrated Battery Complex (LFP Phase),Morocco,60000,120000,Tonnes_LFP_and_NMC_pCAM,Observed_Announced,60 kt/yr LFP roadmap alongside 120 kt/yr NMC pCAM Ex_China_Asset,First Phosphate / Prayon Quebec PPA Plant,"Quebec, Canada",600,60000,TPD_Design_and_TPA_Offtake,Observed_Announced,600 tpd Prayon-licensed igneous apatite PPA design Ex_China_Asset,ICL Group St. Louis LFP Plant ($197M DOE Grant),"Missouri, USA",30000,0,Planned_vs_Active_Tonnes,Observed,Cancelled $400M / 30 ktpa U.S. LFP CAM project Stoichiometry_Model,1 GWh LFP Cell Material Requirement,Illustrative,2350,1803,Tonnes_LFP_CAM_and_85pct_PPA,Modeled_Illustrative,"ESI Model: 2,350 t LFP CAM needs ~1,803 t 85% PPA (~4,358 t rock)" Stoichiometry_Model,40 GWh Western LFP Gigafactory Annual PPA,Illustrative,94000,72128,Tonnes_LFP_CAM_and_85pct_PPA,Modeled_Illustrative,Requires ~24% of EMAPHOS 300 kt/yr plant output Cost_Sensitivity,"China ($950/t) vs Western ($1,600/t) 85% PPA",Illustrative,1.71,2.89,USD_per_kWh_Cell,Modeled_Illustrative,+$1.17/kWh spread (~$117k per 100 MWh utility BESS)