conductor_grade,base_metal_usd_t,cathode_regional_premium_usd_t,rod_conversion_fee_usd_t,drawing_stranding_premium_usd_t,total_delivered_usd_t,total_value_add_above_lme_usd_t,value_add_pct_of_total,oxygen_ppm_max,casting_tech,equipment_lead_months,grid_application "Standard 8mm ETP Copper Rod (C11000, 100-400 ppm O2)",9600,280,360,420,10660,1060,9.9,400 ppm,Southwire SCR / Hazelett Contirod (7-54 t/hr),18,"Building wire, LV/MV distribution cables (<=35 kV)" "Oxygen-Free Copper Rod (Cu-OF / FOXROD, <10 ppm O2)",9600,310,780,640,11330,1730,15.3,10 ppm,UPCAST / Rautomead Vacuum/Inert Vertical Cast,26,"Fine magnet wire, EV motor hairpins, 132-230 kV AC cables" "525 kV HVDC OFHC Milliken Conductor (<5 ppm O2, 2,500 mm2)",9600,350,1150,1680,12780,3180,24.9,5 ppm,Ultra-Pure OFHC UPCAST + Heavy Milliken Strander,34,525 kV HVDC subsea & underground links (2-2.6 GW) "EC-Grade Aluminum 2,500 mm2 Stranded Conductor (Benchmark)",2550,320,390,580,3840,1290,33.6,N/A (Al 99.7%),Continuus-Properzi Aluminum Rod + Strander,16,Onshore 525 kV HVDC land corridors (SuedLink / A-Nord)