campus_copper_layer,layer_code,campus_it_mw,n1_tonnes_per_mw,full_2n_tonnes_per_mw,n1_total_tonnes,full_2n_total_tonnes,fabrication_premium_usd_per_t,lme_base_9800_n1_cost_usd_m,lme_stress_12500_n1_cost_usd_m,lme_base_9800_2n_cost_usd_m,engineering_note "Substation & MV Switchgear Busbars (15-35 kV, Tin/Silver ETP)",mv_switchgear_busbar,100,3.2,4.4,320,440,4800,4.67,5.54,6.42,Solid ETP C11000 bars inside HS 8537.20 lineups LV Main Switchboards & UPS/STS Tie Busbars (480/415V),lv_switchboard_busbar,100,4.8,6.8,480,680,5200,7.20,8.50,10.20,"High-ampacity 4,000-6,000A copper bus risers" White-Space Overhead Busway & Tap-Offs (415V AC vs. 800V DC),overhead_busway,100,4.5,6.2,450,620,6500,7.33,8.55,10.11,800V DC trims overhead/rack copper ~45% vs. 415V/54V "Laminated Rack & PSU Busbars (54V / 800V DC, Low-Inductance)",laminated_rack_busbar,100,1.8,2.4,180,240,14500,4.37,4.86,5.83,Precision polyaramid/PET-insulated laminated bars (Mersen/nVent) "Non-Busbar Campus Copper (Cables, Transformers, Grounding)",cables_transformers,100,20.7,27.2,2070,2720,3200,26.91,32.50,35.36,"Power cables, transformer windings, grounding grids"