Metric_Group,Conductor_or_Scenario,Alloy_and_Core,Value_1,Value_2,Unit,Classification,Source_Note Material_Spec,AAC (All Aluminum Conductor),1350-H19 (99.5% Al),61.2,80,Pct_IACS_and_Max_Temp_C,Observed_Standard,Short-span urban distribution; HTS 7614.90 Material_Spec,AAAC (All Aluminum Alloy Conductor),6201-T81 (Al-Mg-Si),52.5,90,Pct_IACS_and_Max_Temp_C,Observed_Standard,Coastal corrosion-resistant; HTS 7614.90 Material_Spec,"ACSR (Steel Reinforced, Drake 795)",1350-H19 + Galvanized Steel,61.2,90,Pct_IACS_and_Max_Temp_C,Observed_Standard,Legacy transmission workhorse; HTS 7614.10 Material_Spec,HTLS Composite Core (ACCC Drake eq.),1350-O Annealed + Carbon/Glass Core,63.0,180,Pct_IACS_and_Max_Temp_C,Observed_Standard,"2.0x thermal ampacity, low thermal sag, -27.5% R_ac" Grid_Study,UC Berkeley / GridLab 2035 Reconductoring Study,US Interzonal Grid,16,64,TW_Miles_Baseline_vs_Reconductored,Observed_Study,4x faster interzonal expansion (64 vs 16 TW-miles) by 2035 Grid_Study,Reconductoring vs Greenfield Schedule,US Transmission,27,120,Months_Midpoint_Execution,Observed_Range,18-36 months reconductoring vs ~10 years greenfield ROW Supply_Chain,Utility Overhead Conductor Factory Lead Time,North America / Europe,16,40,Weeks_Factory_Lead_Time,Observed_Range,EC 9.5mm redraw rod & alloy 6201 stranding bottleneck Corridor_Model,100 km 230 kV Single-Circuit Rating (ACSR vs HTLS),Drake 795 kcmil eq.,358,717,MVA_Thermal_Capacity,Modeled_Illustrative,2.0x capacity (+359 MVA) on existing towers Corridor_Model,100 km 230 kV Capex (Greenfield vs HTLS Reconductoring),Illustrative Corridor,250,85,USD_Million_Capex,Modeled_Illustrative,66% lower capex ($0.85M/km vs $2.50M/km greenfield) Corridor_Model,"Annual I2R Loss @ 250 MVA (ACSR vs HTLS, $60/MWh)",100 km 3-Phase,4.98,3.61,USD_Million_per_yr,Modeled_Illustrative,"Saves 22,824 MWh/yr ($1.37M/yr; $17.0M 30-yr NPV @ 7%)"