section,entity_or_equipment_class,jurisdiction_or_2019_baseline,undergrounding_or_peak_lead_time,covered_conductor_or_2026_lead_time,poles_or_ppi_surge,unit_cost_or_bottleneck,ignition_risk_reduction,primary_source wmp_program_benchmark,PG&E System Hardening & EUP,Northern/Central CA D.23-11-069 / SB 884,"1,210 mi (Q1 '26) 6,900 mi (to 2037)","~2,000 mi (207 mi in '25)","28,500+",UG: $2.80M/mi CC: $1.21M/mi,UG: 98.5% CC: 68.0%,PG&E 2026 EUP wmp_program_benchmark,Southern California Edison (SCE),Southern CA D.25-09-030 / WMP,269 mi (to '28) +152 mi Burn Scar,"7,206 mi ('25) +775 mi ('26–'28)","148,000+",UG: $2.23M/mi CC: $0.847M/mi,UG: 98.8% CC: 72.0%,SCE 2025 WMP AIR wmp_program_benchmark,San Diego Gas & Electric (SDG&E),"San Diego County, CA Res. SPD-30 / WiNGS","300 mi ('20–'25) 1,500 mi Plan",180 mi ('20–'25) +130 mi ('26–'28),"16,400+",UG: $1.48M/mi CC: $1.552M/mi,UG: 99.02% CC: 58.1%,SDG&E 2026 WMP wmp_program_benchmark,PacifiCorp (6-State WMP),"OR, CA, UT, WA, ID, WY OPUC UM 2207 R1",38 mi (115 mi Plan),358 mi (170 mi OR '25),"11,800+ (4,225 OR '25)",UG: $2.45M/mi CC: $1.18M/mi,UG: 98.0% CC: 65.0%,PacifiCorp UM 2207 wmp_program_benchmark,Xcel Energy (PSCo & SPS),Colorado & Texas/NM 24A-0296E / PUCT,50 mi CO WMP (220 mi Plan),480 mi (CO & TX/NM),"38,000+ (>10k CO; 28k TX)",UG: $2.15M/mi CC: $0.92M/mi,UG: 98.5% CC: 66.5%,Xcel WMP Report wmp_program_benchmark,Hawaiian Electric (HECO WSS),"Oahu, Maui, Hawaii Is. Docket 2025-0156",24 mi (85 mi Plan),110 mi (18 mi in '25),"6,200+ (>2,000 in '25)",UG: $3.10M/mi CC: $1.15M/mi,UG: 99.0% CC: 67.0%,HECO 2025 WSS wmp_program_benchmark,Victoria PBSP (AusNet & Powercor),"Victoria, Australia 44 REFCLs + PRF",333 mi (536 km) PRF Completed,"240 mi +18,000 km REFCL","9,400+",UG: $0.42M/mi CC: $0.39M/mi,UG: 98.5% REFCL: 58.6%,Vic Auditor-Gen wmp_program_benchmark,2018 Camp Fire Rebuild (PG&E),"Paradise & Magalia, CA 18,804 Structures",200 mi Full Town UG Rebuild,36 mi Feeder Ties,"4,600+ (Emergency)",UG: $2.30M/mi ($460M Total),UG: 99.0%,PG&E Paradise wmp_program_benchmark,2021 Dixie Fire Rebuild (PG&E),"Plumas/Butte Co., CA 963,309 Acres",28 mi SR-70 & Greenville Canyon,45 mi Hardened OH,">1,050 (Emergency)",UG: $3.40M/mi (Hard Rock Canyon),UG: 98.5%,CPUC Res. SED-8 wmp_program_benchmark,2023 Maui / Lahaina Rebuild (HECO),"West Maui, HI 2,200+ Structures",15 mi Corridor + Substation Tie,18 mi Steel-Pole OH,400 of 750 (53.3% Lost),UG: $3.25M/mi (300/575 XFMRs),UG: 99.0%,HECO Maui Update wmp_program_benchmark,2024 Smokehouse Creek (Xcel / Co-op),Texas Panhandle 1.058M Acres,8 mi Critical Crossings,120 mi Feeder Reconductor,"8,870 (8k SPS + 870 Co-op)",UG: $1.95M/mi CC: $0.78M/mi,CC/Steel: 64.0%,NRECA / Xcel TX equipment_lead_time_ppi,Single-Phase Pole-Mounted Transformer (10–100 kVA; IEEE C57.12.20 ),4–8 weeks,52–104 weeks,26–40 weeks,+78% to +111% (Spot up to 4x–9x),GOES / amorphous core slitting capacity; biodegradable natural ester fluid tanks; acute storm/fire restocking.,,ESI synthesis from DOE/BLS/IEEE/NREL equipment_lead_time_ppi,"Single- & Three-Phase Pad-Mounted Transformer (15–5,000 kVA; IEEE C57.12.34 / C57.12.28)",4–8 weeks,75–120+ weeks (156w custom),40–60 weeks (52–78w >10 MVA),+86.0% BLS PPI ( PCU335311335311 ),"Dead-front tamper-proof enclosures; 80,000+ custom utility SKUs; +497% hyperscale data-center demand surge.",,ESI synthesis from DOE/BLS/IEEE/NREL equipment_lead_time_ppi,Subsurface Vault & Submersible Transformer ( IEEE C57.12.23 / C57.12.40 ),12–20 weeks,80–156 weeks,50–104 weeks,+95% (+25%–50% over pad-mount),304L/316L stainless steel corrosion tanks; sealed submersible bushings; compact copper winding footprints.,,ESI synthesis from DOE/BLS/IEEE/NREL equipment_lead_time_ppi,"Large Power & Substation GSU Transformer (≥100 MVA, >34.5 kV; IEEE C57.12.00)",50 weeks,80–210 weeks (120w avg),128–160+ weeks,+77% LPT / +80% PPI ( WPU117409 ),PDR-grade GOES imports (80%–88% imported); Continuously Transposed Copper (CTC); 130-week HV OIP/RIP bushings.,,ESI synthesis from DOE/BLS/IEEE/NREL equipment_lead_time_ppi,MV (15–35 kV) Underground Power Cable (TR-XLPE ICEA S-97-682 & EPR S-94-649 ),6–12 weeks,36–78 weeks,20–52 weeks,+99.4% Wire PPI ( WPU10260314 ),Cleanroom TR-XLPE & peroxide semicon compounding; triple-head CCV vulcanization lines; copper concentric neutral wire.,,ESI synthesis from DOE/BLS/IEEE/NREL equipment_lead_time_ppi,"Triple-Extruded Covered Conductor (""Tree Wire"") (15–35 kV 3-Layer HDPE/XLPE)",8–14 weeks,32–60+ weeks,20–36 weeks,+92.9% Alum PPI ( WPU102501 ),Competes directly with MV underground cable for triple-head co-extrusion lines and UV/track-resistant HDPE compounds.,,ESI synthesis from DOE/BLS/IEEE/NREL equipment_lead_time_ppi,SF6-Free / Vacuum Pad Switchgear & Fast-Trip ACRs (15–38 kV Solid-Dielectric / Clean-Air),8–16 weeks,45–80+ weeks,36–65 weeks,+96.0% PPI ( WPU1175 = 433.6 ),Vacuum interrupter bottles; cycloaliphatic epoxy cast resin; CARB/EU SF6 phase-out engineering redesigns.,,ESI synthesis from DOE/BLS/IEEE/NREL equipment_lead_time_ppi,"Fire-Resistant Poles (Ductile Iron, Steel & FRP) (Class 1 / H1 Heavy Loading)",6–12 weeks,20–45+ weeks,12–24 weeks,+103.5% Steel PPI (2x–4x Wood Cost),Centrifugal ductile-iron casting & pultruded fiberglass mandrels for >45 ft Class 1/H1 covered-conductor spans.,,ESI synthesis from DOE/BLS/IEEE/NREL