equipment_category,hs_code,observed_lead_time_range,n_plus_1_hardware_usd_m,reservation_deposit_pct,n_plus_1_deposit_usd_m,deposit_lock_years_pre_cod,carry_7pct_wacc_usd_m,carry_9pct_wacc_usd_m,carry_12pct_wacc_usd_m,cancellation_forfeiture_pct,n_plus_1_forfeiture_usd_m,full_2n_hardware_usd_m,full_2n_deposit_usd_m "HV Substation LPTs (230/34.5 kV, 3x 75-100 MVA)",HS 8504.23,128-160+ wks,16.0,30,4.8,2.5,0.84,1.08,1.44,25,4.0,18.4,5.52 "MV Switchgear & HV Breakers (15-35 kV, AI-spec)",HS 8537.20,44-100+ wks (HV breakers ~125 wks),22.0,25,5.5,1.5,0.58,0.74,0.99,20,4.4,29.7,7.42 Campus Step-Down Liquid Transformers (2.5-3.5 MVA),HS 8504.22,60-90 wks,12.0,20,2.4,1.2,0.2,0.26,0.35,15,1.8,16.2,3.24 "LV Switchboards, STS, PDUs & Busway Interface",HS 8537.10,40-65 wks,28.0,15,4.2,1.0,0.29,0.38,0.5,15,4.2,37.8,5.67 TOTAL_100MW_IT_CAMPUS,HS 8504/8537,40-160+ wks,78.0,21.7,16.9,1.0-2.5 yrs,1.91,2.46,3.28,18.5,14.4,102.1,21.85