generation,reference_class,package_body_mm,package_area_mm2,total_layers,buildup_pairs,panel_size_mm,active_panel_area_mm2,pitch_mm_with_4mm_kerf,panel_grid,gross_units_per_panel,gross_panel_area_utilization_pct,yield_conservative_pct,yield_base_pct,yield_optimistic_pct,good_units_per_panel_cons,good_units_per_panel_base,good_units_per_panel_opt,effective_factory_pass_multiplier_base,effective_factory_pass_multiplier_cons,effective_factory_pass_multiplier_opt Legacy Server CPU (Baseline),Enterprise x86 server CPU,55x55,3025,12,4,510x515,213900,59,7x7,49,56.4,80,86,91,39.2,42.14,44.59,1.0,1.07,0.95 Single-Reticle AI GPU (Hopper-Class),1-reticle HBM3/3E accelerator,70x70,4900,16,6,510x515,213900,74,6x6,36,67.2,66,74,81,23.76,26.64,29.16,2.37,2.66,2.17 Dual-Reticle AI Accelerator (Blackwell-Class),Dual-die CoWoS-L + 8x HBM3E,100x100,10000,20,8,510x515,213900,104,4x4,16,60.9,52,60,68,8.32,9.6,10.88,8.78,10.13,7.75 Next-Gen Multi-Reticle (Rubin-Class),Multi-reticle + HBM4 (2027-2028),120x120,14400,24,10,510x515,213900,124,3x3,9,49.3,42,50,58,3.78,4.5,5.22,23.41,27.87,20.18