Computational Fluid Dynamics (CFD) Validation

PPS-GF40 Injection Molded Enclosure & MIDEL 7131 Synthetic Ester

Document Ref: ESI-CFD-2026-A1 | Simulation Engine: OpenFOAM | Solver: buoyantBoussinesqPimpleFoam
CFD Thermal Heatmap showing cool fluid entering and hot fluid exiting around AI processors

Boundary Conditions & Inputs

Fluid MediumMIDEL 7131 (Synthetic Ester)
IT Load per Chassis8,000 W (8 kW)
Fluid Inlet Temperature40.0 °C
Inlet Mass Flow Rate0.082 kg/s
Dielectric Strength>75 kV
Ambient Air Temp.N/A (Fully Sealed)

Simulation Results & Validation

Fluid Outlet Temperature44.8 °C (ΔT = 4.8°C)
Max Silicon Junction Temp (T_j)71.3 °C (Safe limit: 90°C)
Pressure Drop (ΔP)0.14 bar (14 kPa)
Pump Power per Chassis11.2 W
Thermal Resistance (R_th)0.0039 K/W
Validation StatusPASS

Conclusion: The DEMPC-guided mass flow successfully extracts 8kW of TDP via natural and forced convection within the PPS-GF40 enclosure. No thermal throttling points observed. Maximum silicon junction temperature remains 18.7°C below critical failure thresholds, validating the Day Zero ROI PUE 1.02 thesis.

← Return to The Main Report

⚠ Legal & Engineering Disclaimer

The CFD simulations and thermal models provided herein are designed exclusively for educational, analytical, and informational purposes. Energy Solutions Intelligence (ESI) is not an engineering firm of record. These models should not be construed as stamped engineering advice. EPC contractors and facility operators must perform independent technical validation before deployment.