🇨🇳
Trade & Tariffs · China · Verified Nov 2026

China Antimony Export Ban & Dual-Use Licensing Regime

China's antimony export controls operate across two legal tiers, not a single global embargo. MOFCOM and Customs (GAC) Announcement No. 33 of 2024 (effective 15 September 2024) requires case-by-case dual-use licences worldwide for listed antimony ores, metals, oxides (≥99.99%), organo-antimony compounds, and smelting technologies. Announcement No. 46 of 2024 (3 December 2024) added U.S.-specific bans. Following pauses via Announcement No. 72/2025 and No. 59/2026, the commercial U.S. prohibition is suspended from 28 November 2026 through 27 January 2027, while global licensing and the U.S. military end-use ban remain permanently enforced.
No. 33 & 46/2024 State Council Order 792 No. 59/2026 Pause to Jan 2027
Global Licensing Start
15 Sep 2024
MOFCOM / GAC No. 33/2024
U.S. Commercial Pause
27 Jan 2027
Extended via No. 59/2026
Triad Mine Share
~85%
China, Tajikistan & Russia
2025 Rotterdam Peak
$50k-$60k/t
Spot spike prior to 2026 easing

Institutional Regulatory Summary

Mechanism Status Authority Effective Window Key Threshold
Global Antimony Licensing
Announcement No. 33 of 2024
Active / Permanent MOFCOM & GAC 15 Sep 2024 onward HS 261710, 811010, oxides ≥99.99% (2825800010), organo-Sb >99.999%, smelting tech
Dual-Use Control Regulations
State Council Order No. 792
Active / Permanent State Council of the PRC 1 Dec 2024 onward Unified control list; single (1-yr) & general (3-yr) licences; end-user verification
U.S. Dual-Use Prohibitions
Announcement No. 46 of 2024
Art. 1 Active / Art. 2 Paused MOFCOM 3 Dec 2024 (Art. 1 permanent) Art. 1: U.S. military ban; Art. 2: Commercial denial (paused); Art. 3: Third-party re-export liability
U.S. Commercial Pause Windows
No. 72/2025 & No. 59/2026
Temporary Suspension MOFCOM 9 Nov 2025 to 27 Nov 2026; 28 Nov 2026 to 27 Jan 2027 Suspends Art. 2 denial only; civilian U.S. exports revert to case-by-case review

How Order No. 792 and Rolling Truces Reshaped Compliance

Supply-chain teams often mistake Beijing's baseline export-licensing law for an expired U.S. trade ban. Distinguishing the permanent legal chassis from temporary bilateral rollovers is critical for procurement underwriting.

Export Control Law & State Council Order No. 792

China's antimony controls draw statutory authority from the Export Control Law (2020), the Foreign Trade Law, and the Customs Law. Published on 15 August 2024 and effective 15 September 2024, MOFCOM and GAC Announcement No. 33 subjected listed antimony raw materials, metals, ultra-pure oxides, semiconductor precursors, and gold-antimony smelting technologies to mandatory export licensing.

State Council Decree (Order) No. 792, signed by Premier Li Qiang on 30 September 2024 and effective 1 December 2024, unified China's fragmented nuclear, chemical, biological, and missile rules into one consolidated Dual-Use Items Export Control List. Order No. 792 eliminated legacy exporter pre-registration requirements while formalizing single licences (valid up to one year), general licences (up to three years), end-user verification, and watch-list enforcement.

Announcement No. 46 and 2025-2026 U.S. Suspensions

On 3 December 2024, MOFCOM issued Announcement No. 46 targeting the United States in response to U.S. semiconductor restrictions. Paragraph 1 permanently prohibited dual-use exports to U.S. military end-users or military applications. Paragraph 2 instituted an "in-principle prohibition" (presumed licence denial) on U.S.-bound antimony, gallium, germanium, and superhard materials, plus stricter end-use reviews for graphite.

Subsequent trade negotiations introduced tactical pauses on Paragraph 2 without repealing the underlying decree. On 9 November 2025, Announcement No. 72 of 2025 suspended Paragraph 2 through 27 November 2026. In late November 2026, Announcement No. 59 of 2026 extended that pause from 28 November 2026 through 27 January 2027. Civilian U.S. buyers can apply for licences during this 60-day window, yet MOFCOM keeps full discretionary approval power and leaves Paragraph 1 military bans untouched.

Extraterritorial Re-Export Liability & Anti-Smuggling Crackdowns

Paragraph 3 of Announcement No. 46 extends legal liability to any foreign organization or individual that diverts Chinese-origin controlled items to restricted U.S. recipients. That clause directly affects European compounders, Southeast Asian solar-glass plants, and Mexican polymer converters exporting downstream goods to U.S. industrial buyers. Across 2025 and 2026, MOFCOM joined GAC, the Ministry of Public Security, and the Ministry of State Security in special enforcement sweeps targeting false customs declarations and third-country transshipment. Chinese courts imposed prison sentences of up to 12 years on ringleaders trafficking unlicensed antimony ingots, eliminating grey-market arbitrage as a viable supply hedge.

Controlled Antimony Scope, HS Codes & Purity Cut-Offs

Purity thresholds and 10-digit customs declarations determine licensing eligibility and port inspection friction at Chinese exit checkpoints.

Controlled Item Category Reference PRC HS Codes Technical / Purity Threshold Industrial & Energy Exposure
Antimony Ores & Concentrates 2617101000, 2617109001, 2617109090 Blocks, granules, powders, crystals, concentrates Restricts raw stibnite feedstock exports to overseas roasters
Metallic Antimony & Products 8110101000, 8110102000 Unwrought metal, ingots, blocks, beads, granules, powders (incl. 99.65% min) Constrains lead-acid battery grids, alloys, munitions, and ex-China oxide synthesis
High-Purity Antimony Oxides 2825800010 (under HS 282580) Purity ≥ 99.99% (including powders) Specialty optical and electronic grades; commercial oxides (<99.99%) face customs lab audits
Organo-Antimony & Hydrides Dual-use chemical lines (trimethyl/triethyl Sb, stibine, InSb) Purity > 99.999% (5N+ semiconductor grade) Precursors for III-V compound semiconductors and infrared sensors
Smelting & Separation Tech Intangible technology & engineering controls Gold-antimony smelting and separation flowsheets Limits turnkey Chinese process engineering exports to competing mining jurisdictions

End-User Certificates (EUC)

Applications routed via provincial commerce bureaus to MOFCOM require sales contracts, assay sheets, and signed End-User and End-Use Certificates naming the exact factory and certifying non-diversion. Trading-house shipments lacking named downstream users face routine rejections.

Review Clocks & Port Sampling

Order No. 792 sets a 45-working-day statutory review period, extendable for interagency vetting. Even standard flame-retardant antimony trioxide (99.5% to 99.8% purity, nominally below 2825800010) frequently incurs GAC laboratory purity sampling at port before clearance.

Downstream Pyroantimonate Spillover

Although sodium pyroantimonate sits downstream of raw metal codes, non-Chinese clarifier plants depend on imported HS 811010 ingots and crude oxides. Whenever Chinese metal licences tighten, overseas chemical converters experience immediate feedstock squeezes.

Clean-Energy Bottlenecks and the 2024-2026 Price Dislocation

While defense munitions draw political focus, ultra-clear photovoltaic cover glass and electrical flame retardants dominate commercial industrial vulnerability.

Sodium Pyroantimonate in Solar Cover Glass

Crystalline silicon PV modules require low-iron cover glass with total iron (ΣFe2O3) below 0.015 wt% and uncoated solar transmittance of at least 91.5%. Glass furnaces dose sodium pyroantimonate (Na2H2Sb2O7 / NaSb(OH)6) at roughly 0.2 wt% to 0.4 wt% of batch weight (or up to 0.1 g per 100 g glass matrix in composite fining systems).

At melting temperatures, sodium pyroantimonate decomposes to release oxygen (O2), sweeping micro-bubbles ("seeds") that scatter sunlight, while oxidizing green-tinting ferrous ions (Fe2+, strongly absorptive near 1,100 nm) into low-absorption ferric ions (Fe3+). Because clarifiers account for a minor share of module cost per watt, Chinese glassmakers absorbed elevated antimony pricing during 2025. Overseas float-glass lines in India, Europe, and North America remain far more exposed to landed feedstock spikes, feeding into project economics tracked in our LCOE Calculator and Solar Sizing Tool.

Sulfate-Cerium Substitution & Electrical Demand

Antimony-free solar glass formulations pair sodium sulfate (Na2SO4, 0.03 to 0.6 wt%) with cerium oxide (CeO2, 0.01 to 0.2 wt%). Heavy sulfate loads trigger secondary re-boil bubbles and corrosive SOx stack emissions, whereas dosing cerium oxide above 0.2 wt% shifts the UV cut-off edge, causing yellow tinting and UV solarization that cuts lifetime transmittance. Project engineers should benchmark optical losses alongside field decay in our 2026 Solar Panel Degradation Analysis.

Per USGS Mineral Commodity Summaries 2026, U.S. apparent consumption splits across flame retardants (49%, vital in EV battery enclosures, switchgear, and wiring polymers), metal products including stationary lead-acid battery grids and munitions (40%), and nonmetal glass, ceramics, and rubber (11%). Secondary lead-acid battery recycling met ~12% of U.S. demand in 2025 (down from ~15% in 2024), while recovered secondary value jumped from ~$73 million to $190 million on surging metal prices.

2024-2026 Spot Benchmarks: Rotterdam Premium vs. China Domestic

USGS data shows antimony metal nearly doubled from $8.91/lb in July 2024 to $17.50/lb by November 2024 after Announcement No. 33. Following Announcement No. 46's U.S. halt, physical scarcity drove Fastmarkets in-warehouse Rotterdam standard 99.65% min ingot prices to historic peaks of $50,000 to $60,000 per metric ton ($22 to $27+/lb) in 2025. Rolling U.S. suspension windows and shifting trade routes eased 2026 benchmarks: Rotterdam warehouse prices retreated toward $17,000 to $21,000+/t across parts of 2026 against Chinese domestic/FOB quotes roughly around $15,000 to $17,000+/t. That persistent regional spread prices in ongoing licensing latency and customs compliance risk.

Global Mine Concentration & 2026-2028 Diversification Reality

World antimony mine output averages roughly 110,000 tonnes per year (USGS), with China, Tajikistan, and Russia supplying ~85%. Western mine restarts crossed key milestones in 2025-2026, yet non-Chinese smelting capacity remains narrow.

Jurisdiction / Asset Operator Verified Status (Nov 2026) Scale / Global Share Midstream & Trade Constraint
China (Hunan, Guangxi, Guizhou) Domestic SOEs & private refiners Active under dual-use licensing ~35%-40% of global mine output; dominant smelter share Falling ore grades and environmental curbs; primary global roaster sink
Tajikistan (Anzob / TALCO Gold) TALCO & JV operators Active producer ~18%-20% of global mine output Heavy concentrate flows to China; limited independent high-purity oxide capacity
Russia (Olimpiada & by-products) Polyus & regional miners Active; sanctioned in Western markets Forms ~85% triad with China & Tajikistan Sanctions bar Russian units from U.S. and EU clean-energy chains
Australia: Hillgrove (NSW) Larvotto Resources Restarted 31 Aug 2026; first 68 t Sb concentrate shipped Oct 2026 to Wogen May 2025 DFS targets ~4,900 t/yr Sb & ~40,500 oz/yr Au (8-yr life) Near-term Western concentrate supply; ex-China oxide refining still tight
Australia: Costerfield (Victoria) Mandalay Resources / Alkane group Active producer ~1,300 t/yr antimony (gold co-product) Modest absolute tonnage relative to ~110,000 t global consumption
United States: Stibnite (Idaho) Perpetua Resources USFS Final ROD 3 Jan 2025; USACE 404 ROD May 2025; Plan of Operations Oct 2025; court upheld approvals Aug 2026 Major projected U.S. antimony share plus ~450,000 oz/yr gold (yrs 1-4) Multi-year mine build; requires domestic smelting and refining integration
United States: Montana U.S. Antimony Corp. & domestic operators Active processing; USGS MCS 2026 notes Montana mining resumed in 2025 Niche domestic primary output plus ~12% secondary lead-acid recovery Limited domestic tonnage; historic reliance on imported concentrates

Midstream Roasting Chokepoint

Converting stibnite (Sb2S3) concentrate into 99.65% metal, antimony trioxide, and solar-grade sodium pyroantimonate depends on specialized roasters heavily concentrated in China. Announcement No. 33's control over gold-antimony smelting technology slows overseas plant builds, echoing vulnerabilities tracked in our Critical Minerals Refining Concentration report.

EU CRMA & Allied Targets

Antimony is designated strategic under both U.S. federal critical-mineral lists and the EU Critical Raw Materials Act (CRMA), which mandates 40% domestic processing and a 65% single-country ceiling by 2030. Permitting hurdles for European and North American roasters mean restarts like Hillgrove still compete for scarce ex-China smelter capacity in Oman, Vietnam, Mexico, and Montana.

Strategic Procurement Playbook

Industrial sponsors should replace spot purchasing with direct equity partnerships or multi-year physical offtake contracts linked to allied concentrate producers, require contractual origin warranties from tier-1 solar glass and flame-retardant vendors, pre-qualify low-antimony glass lines with explicit transmittance-loss modeling, and ring-fence civilian U.S. inventories under strict customs audit trails.

Executive Regulatory & Supply-Chain Q&A

Is China's antimony policy a total global export ban?
No. China runs a two-tier dual-use regime. MOFCOM and GAC Announcement No. 33 of 2024 (effective 15 September 2024) requires case-by-case export licences worldwide for listed antimony ores, metals, high-purity oxides, organo-antimony compounds, and gold-antimony smelting technologies. Country-specific U.S. prohibitions were layered separately via Announcement No. 46 of 2024.
What is the status of China's U.S. antimony export ban in late November 2026?
Paragraph 1 of Announcement No. 46 of 2024, banning dual-use exports to U.S. military users or military end-uses, remains permanently enforced. Paragraph 2 (presumed denial on commercial U.S. shipments of antimony, gallium, germanium, and superhard materials) was paused by Announcement No. 72 of 2025 through 27 November 2026 and extended by Announcement No. 59 of 2026 from 28 November 2026 through 27 January 2027.
Which HS codes and purity levels trigger licensing under Announcement No. 33 of 2024?
Reference tariff lines cover HS 261710 (2617101000, 2617109001, 2617109090) for antimony ores and concentrates; HS 811010 (8110101000, 8110102000) for unwrought antimony metal, ingots, and powders; and HS 2825800010 for antimony oxides at purity ≥ 99.99%. Organo-antimony compounds and antimony hydride require purity > 99.999%, and gold-antimony smelting technologies are separately controlled.
How do antimony export controls affect solar glass and photovoltaic modules?
Low-iron solar cover glass uses sodium pyroantimonate at 0.2 to 0.4 wt% of batch weight to sweep micro-bubbles and oxidize ferrous ions (Fe2+) into ferric ions (Fe3+), maintaining uncoated solar transmittance at or above 91.5%. Antimony-free sodium sulfate and cerium oxide alternatives face re-boil bubbling, higher SOx emissions, and UV-yellowing losses if cerium exceeds 0.2 wt%.
Can third-country processors re-export Chinese antimony to the United States?
Not in breach of Chinese end-use conditions. Paragraph 3 of Announcement No. 46 and State Council Order No. 792 impose extraterritorial accountability on foreign entities diverting Chinese-origin controlled items to restricted U.S. recipients. During 2025-2026, joint MOFCOM, GAC, Public Security, and State Security sweeps prosecuted third-country transshipment rings, yielding prison sentences up to 12 years.
When will Hillgrove and Stibnite reduce reliance on Chinese antimony?
Australia's Hillgrove mine (Larvotto Resources) restarted commercial production on 31 August 2026 and shipped its first 68 tonnes of antimony concentrate in October 2026, targeting ~4,900 tonnes annually. In Idaho, Perpetua Resources secured its USFS Final Record of Decision on 3 January 2025 and Plan of Operations approval in October 2025, though multi-year construction and ex-China smelting remain key bottlenecks.

Official Statutory & Geological References

Citations verified directly against official ministerial registers and government geological publications as of November 2026.

Regulatory Verification & Primary Basis

Every statutory threshold, HS code reference, suspension window, and project milestone in this dossier is anchored to primary ministerial announcements, State Council decrees, and federal geological registers.

Primary-Source AnchoringControl thresholds (≥99.99% oxides, >99.999% organo-antimony) and rolling U.S. pause dates (Announcements No. 72/2025 and No. 59/2026) are verified against official government filings.
Compliance DiligenceBecause the Paragraph 2 U.S. suspension expires on 27 January 2027 unless extended, buyers should verify live 10-digit PRC tariff codes, lab assay certificates, and end-user declarations prior to shipment.
Authored & Verified by Khaled Shawky · Chief Energy Systems & Policy Editor, Energy Solutions Intelligence Verification Cycle: November 2026