| Mechanism | Status | Authority | Effective Window | Key Threshold |
|---|---|---|---|---|
| Section 40B SAF Credit Per-gallon excise tax credit for qualified SAF | Expired | IRA §13201 / 26 USC §40B | Jan 1, 2023 – Dec 31, 2024 | ≥50% lifecycle GHG reduction vs. petroleum jet fuel |
| Section 45Z Clean Fuel Production Credit Technology-neutral per-gallon credit for low-CI transportation fuel | Active | IRA §13704 / 26 USC §45Z | Jan 1, 2025 – Dec 31, 2027 | CI ≤ 50 kg CO2e/MMBtu (SAF); ≤ 25 kg CO2e/MMBtu (non-aviation) |
The Inflation Reduction Act created two distinct but sequential sustainable aviation fuel incentives. Section 40B, enacted as Section 13201 of the IRA, established a targeted per-gallon credit for SAF meeting a minimum 50% lifecycle greenhouse gas reduction threshold relative to conventional jet fuel. The credit operated on a sliding scale: $1.25 per gallon at the 50% threshold, increasing by $0.01 for each percentage point of additional reduction up to a maximum of $1.75 per gallon at 100% reduction. This structure deliberately favored fuels with deeper decarbonization profiles.
Critically, Section 40B contained a hard sunset. The credit applied only to fuel sold or used in calendar years 2023 and 2024. No extension mechanism existed in the original statute. The Joint Committee on Taxation estimated the two-year cost at approximately $200 million, reflecting the nascent state of commercial SAF volumes at enactment. By contrast, Section 45Z (enacted as IRA Section 13704) represents a broader, technology-neutral clean fuel production credit covering all transportation fuels, including SAF, for 2025 through 2027. Section 45Z replaces the lifecycle GHG percentage threshold with a carbon intensity (CI) metric measured in kg CO2e/MMBtu, calculated under the GREET model or CORSIA methodology as specified in IRS guidance.
| Attribute | Section 40B (Expired) | Section 45Z (Active 2025–2027) |
|---|---|---|
| Statutory Authority | IRA §13201 / 26 USC §40B | IRA §13704 / 26 USC §45Z |
| Eligible Fuel | SAF only | All transportation fuels (SAF, renewable diesel, ethanol, etc.) |
| Metric | Lifecycle GHG reduction % vs. petroleum jet | Carbon intensity (kg CO2e/MMBtu) via GREET/CORSIA |
| Credit Rate | $1.25–$1.75/gal (sliding scale) | $0.20–$1.00/gal (SAF); $0.35–$1.75/gal (non-aviation) |
| Availability Window | 2023–2024 only | 2025–2027 |
| Registration Requirement | IRS Form 8849, Schedule 3 | IRS registration per Notice 2024-37 + Form 7218 |
The transition from percentage-based to intensity-based accounting reflects a deliberate policy shift toward harmonization with international frameworks such as CORSIA and the EU Renewable Energy Directive. Section 45Z also introduces a domestic production requirement: fuel must be produced in the United States from qualifying feedstocks, with imported finished fuel excluded. This provision aims to anchor supply chains and sponsor equity commitments within U.S. jurisdictions.
IRS Notice 2024-37, published in June 2024, provides the operative guidance for both the tail end of Section 40B and the launch of Section 45Z. The notice establishes registration procedures for producers of clean transportation fuels, requiring submission of facility-level data, feedstock sourcing documentation, and third-party lifecycle analysis (LCA) verification. For Section 40B claimants, the notice clarified that the 50% threshold must be demonstrated using the GREET 2023 model or an approved CORSIA methodology, with results certified by an independent verifier accredited under ISO 14065.
For Section 45Z, Notice 2024-37 mandates annual registration by January 31 of each credit year. Producers must report facility capacity, projected output, feedstock categories, and preliminary CI scores. The IRS reserves the right to audit CI calculations and may require updated LCAs if feedstock mixes change materially. Critically, the notice specifies that carbon capture and sequestration (CCS) adjustments to CI scores are permitted only where the sequestration meets the monitoring, reporting, and verification (MRV) standards of 26 CFR §1.45Q-4. This alignment prevents double-counting between Section 45Z and Section 45Q credits.
| Compliance Element | Section 40B (2023–2024) | Section 45Z (2025–2027) |
|---|---|---|
| Registration Deadline | With excise tax return (Form 720) | Annual by Jan 31 (Notice 2024-37) |
| LCA Model | GREET 2023 or CORSIA | GREET 2024 or CORSIA (updated annually) |
| Verifier Accreditation | ISO 14065 required | ISO 14065 required |
| CCS Adjustment | Not permitted | Permitted per §1.45Q-4 MRV standards |
| Record Retention | 3 years from filing | 6 years from credit claim |
| Penalty for Misstatement | 20% accuracy-related penalty | 20% accuracy-related penalty + credit recapture |
Producers transitioning from Section 40B to Section 45Z must re-register facilities even if previously registered under the expired credit. The IRS has indicated that streamlined re-registration is available for facilities with unchanged feedstock and process configurations, but any modification to feedstock sourcing, such as shifting from soybean oil to used cooking oil, triggers a full new LCA requirement. This creates a compliance milestone that sponsors should factor into project timelines and milestone grant applications.
Section 40B eligibility hinged on feedstock classification under the GREET model. Approved pathways included hydroprocessed esters and fatty acids (HEFA) from soybean oil, canola oil, used cooking oil, and animal fats; alcohol-to-jet (ATJ) from corn ethanol and sugarcane ethanol; and Fischer-Tropsch (FT) synthesis from municipal solid waste and forest residues. Each pathway carried a default CI score, but producers could petition for pathway-specific adjustments using facility-level data.
Section 45Z expands the feedstock universe while tightening indirect land use change (ILUC) accounting. The GREET 2024 model incorporates updated ILUC factors for crop-based feedstocks, generally increasing CI scores for corn and soybean pathways by 8–12 kg CO2e/MMBtu relative to GREET 2023. This shift means that many HEFA pathways that comfortably cleared the 50% threshold under Section 40B may now approach or exceed the Section 45Z SAF threshold of 50 kg CO2e/MMBtu. Waste and residue feedstocks, used cooking oil, tallow, corn stover, forest slash, receive favorable ILUC treatment (near-zero) and remain the most robust pathways for Section 45Z compliance.
The American Soybean Association's June 2024 analysis highlighted that soybean oil HEFA under GREET 2024 yields a CI of approximately 48–52 kg CO2e/MMBtu, placing it at the margin of eligibility. Producers relying on soybean oil should secure facility-specific LCA verification early and consider blending with lower-CI feedstocks to create compliance headroom. The IRS has signaled that pathway petitions for novel feedstocks (e.g., camelina, pennycress, algae) will be evaluated on a case-by-case basis with a 180-day review timeline.
The expiration of Section 40B and the phasedown of Section 45Z after 2027 create a compressed policy window for SAF project deployment. Sponsors must align facility commissioning, offtake agreements, and tax credit monetization within the 2025–2027 eligibility period. The per-gallon credit under Section 45Z, up to $1.00/gal for SAF meeting the 50 kg CO2e/MMBtu threshold, represents a material revenue stream that can support sponsor equity returns when combined with long-term offtake contracts (PPAs) with airlines and corporate buyers.
Monetization of Section 45Z credits occurs through federal income tax reduction or, for tax-exempt entities, direct pay election under Section 6417. Direct pay is available for the first five years of facility operation, providing a cash-flow mechanism that does not require tax appetite partners. This feature is particularly valuable for projects structured with milestone grant funding from the DOE Bioenergy Technologies Office or state-level clean fuel programs. Sponsors should model credit value as a contingent revenue stream subject to CI verification risk and policy sunset risk post-2027.
The One Big Beautiful Bill Act (H.R. 1), enacted in October 2025, modified Section 45Z to expand eligibility for conventional biofuels while reducing the maximum SAF credit rate by $0.25/gal for facilities commencing construction after June 2025. This legislative adjustment underscores the importance of securing IRS registration and beginning construction before statutory deadlines. Projects with executed EPC contracts and feedstock supply agreements by December 2025 are best positioned to capture the full credit value through 2027. Reserve fund allocations for CI re-verification and potential credit recapture should be incorporated into project capitalization tables.
All statutory instruments, regulatory thresholds, and 2025-2026 implementation milestones are anchored to primary government registers and national regulators.
This dossier synthesizes primary statutory text (IRA §§13201, 13704), IRS Notice 2024-37, Form 7218 instructions, and 2025 legislative amendments to map the full regulatory arc from Section 40B expiration through Section 45Z operation.
Explore technical benchmarks, engineering calculators, and supply-chain intelligence aligned with this policy.