Tax Credits & Subsidies · Japan · Verified Nov 2026

Japan Feed-in Premium (FIP): FY2026 METI Rules & Settlement

Japan's Feed-in Premium (FIP) scheme replaces fixed utility purchase contracts with a market-linked premium calculated from METI's annual Reference Price, JEPX wholesale capture averages, Non-Fossil Value, and a Year-1 balancing allowance of ¥1.00/kWh. Starting FY2026, METI expanded mandatory FIP to solar projects ≥50 kW, capped ≥250 kW solar auctions at ¥9.60/kWh, set the consumer surcharge at ¥4.18/kWh, excluded general wood biomass ≥10 MW, and confirmed the FY2027 cutoff for new ground-mounted solar support.
Statutory FIP Settlement METI Doc 20260319004 ≥50 kW Solar Mandatory FIP
FY2026 Surcharge
¥4.18/kWh
May 2026 to April 2027 billing
Solar FIP Threshold
≥ 50 kW
Mandatory FIP from FY2026
Solar Auction Cap
¥9.60/kWh
Rounds 28–31 (≥250 kW)
Balancing Support
¥1.00/kWh
Year-1 FY2026 COD allowance

Institutional Regulatory Matrix (FY2024–FY2026)

Enacted parameters under the Amended Renewable Energy Act (2022 and April 2024 revisions) and METI's March 2025 and March 2026 Procurement Price Calculation Committee determinations.

Mechanism Status Authority Effective Window Key Threshold
Feed-in Premium (FIP) Core Settlement
Market sales + floating premium + NFC retention
Active & Expanding METI / ANRE Apr 1, 2022 onward (FY2026 expansion) Solar ≥50 kW mandatory FIP; ≥250 kW ground-mount auction cap ¥9.60/kWh
Rooftop Staircase Initial Support
Front-loaded payback tariff (FIT/FIP)
Active ANRE / METI Oct 2025 through FY2026+ <10 kW: ¥24 (Y1–4) / ¥8.3 (Y5–10); ≥10 kW roof: ¥19 (Y1–5) / ¥8.3 (Y6–20)
Ground-Mounted Solar Sunset & Biomass Cutoff
Levy-burden containment reform
Enacted Phase-Out METI Biomass: FY2026; Ground Solar: FY2027 Wood biomass ≥10 MW & all liquid biomass cut FY2026; ground solar ≥10 kW cut FY2027
Community Briefing & Escrow Withholding
GX Decarbonization Electricity Act
Mandatory Pre-ID METI / OCCTO Apr 1, 2024 onward Resident briefing mandatory ≥50 kW before METI ID; OCCTO escrows FIP payments on breach
External Decommissioning Reserve
End-of-life solar dismantling fund
Mandatory OCCTO Jul 2022 onward (Years 11–20) All FIT/FIP solar ≥10 kW withheld externally during final 10 support years

How METI Rewired Japan's FIT/FIP Thresholds for FY2026–FY2027

Japan's renewable subsidy framework has moved decisively from passive utility off-take toward wholesale market discipline, rooftop prioritization, and strict levy containment.

Japan enacted the Feed-in Premium (FIP) scheme through the 2020 Renewable Energy Act amendment, effective April 1, 2022. Under FIT, regional utilities bought output at fixed prices, absorbed forecast errors, and pooled environmental attributes to offset surcharges. Under FIP, generators sell power into the Japan Electric Power Exchange (JEPX) or bilateral corporate contracts and collect a monthly floating premium from OCCTO funded by the consumer surcharge (fukakin).

Two pressures drove METI's FY2025–FY2026 rulebook overhaul. First, the surcharge climbed from ¥3.49/kWh in FY2024 to ¥3.98/kWh in FY2025 (March 21, 2025) and reached ¥4.18/kWh in FY2026 (METI Press Release No. 20260319004, March 19, 2026, effective May 2026 through April 2027). METI's FY2026 budget reflects ¥4.85 trillion in gross purchase and premium outlays less ¥1.65 trillion in wholesale avoidable costs across 7,665 billion kWh of retail demand. Second, multi-megawatt curtailment spread from Kyushu, Shikoku, and Hokkaido into the TEPCO (Tokyo) grid during spring 2025 and 2026.

METI's March 2026 determination drew sharp capacity lines. Mandatory FIP coverage for solar PV expanded from ≥250 kW down to ≥50 kW starting FY2026, closing traditional FIT to mid-scale commercial arrays. Simultaneously, METI paired a front-loaded Initial Investment Support Scheme (staircase tariff, October 2025 through FY2026) for built-environment PV (<10 kW: ¥24/kWh Y1–4, ¥8.3/kWh Y5–10; ≥10 kW rooftop: ¥19/kWh Y1–5, ¥8.3/kWh Y6–20) with a hard ground-mount cutoff. Ground-mounted solar ≥10 kW enters its final certification window in FY2026 (¥9.9/kWh for 10–<50 kW; ¥9.60/kWh ceiling for ≥50 kW non-auction and ≥250 kW auction Rounds 28–31) before losing all new FIT/FIP eligibility in FY2027. Parallel controls excluded general wood biomass ≥10 MW and all liquid-fuel biomass from FY2026 onward.

Technology & Capacity Tier FY2025 Regime & Rate FY2026 Regime & Rate Support Term & Key Statutory Condition
Solar PV < 10 kW
Residential rooftop
FIT: ¥15/kWh (Apr–Sep)
Staircase (Oct–Mar): ¥24 (Y1–4) / ¥8.3 (Y5–10)
FIT Initial Support Staircase:
¥24/kWh (Y1–4) / ¥8.3/kWh (Y5–10)
10-year FIT; no OCCTO external decommissioning deduction (<10 kW exempt)
Solar PV ≥ 10 kW (Rooftop)
Commercial & industrial roofs
10–<50 kW H1: ¥11.5/kWh
H2 Staircase: ¥19 (Y1–5) / ¥8.3 (Y6–20)
¥19/kWh (Y1–5) / ¥8.3/kWh (Y6–20)
(FIP mandatory/applicable at ≥50 kW)
20-year term; exempt from competitive auctions; priority rooftop track survives FY2027
Solar PV 10 to < 50 kW (Ground)
Small ground-mounted
FIT (regional use): ¥8.90/kWh
(selected self-consumption rules)
FIT/FIP (regional use): ¥9.90/kWh
(includes balancing/integration update)
20-year term; excluded from new FIT/FIP from FY2027 (FY2026 final window)
Solar PV 50 to < 250 kW (Ground)
Mid-scale commercial ground
FIT/FIP optional: ¥8.90/kWh
(non-auction threshold)
Mandatory FIP (non-auction):
¥9.60/kWh reference price
20-year FIP; mandatory April 2024 resident briefing; cut from FY2027
Solar PV ≥ 250 kW (Ground)
Utility-scale ground-mounted
Mandatory FIP Auction (R24–27):
Ceilings ¥8.90 → ¥8.68/kWh
Mandatory FIP Auction (R28–31):
Flat ceiling ¥9.60/kWh
20-year FIP; ¥1.00/kWh Year-1 balancing allowance; cut from FY2027
Onshore Wind (<50 kW / ≥50 kW)
Land-based wind & repowering
<50 kW & ref: ¥13–¥14/kWh
≥50 kW Auction cap: ¥14/kWh
<50 kW: ¥14/kWh
≥50 kW FIP Auction (R6 cap): ¥14/kWh
20-year term; ≥50 kW subject to FIP, EIA/community briefings, and grid telemetry
Offshore Wind
Bottom-fixed & floating
Promoted zones: Sea Area Act tender
Floating: ¥36/kWh (FIT/FIP)
Non-promoted: auction (no pre-set cap)
Floating: ¥36/kWh (FIT/FIP choice)
20-year term; seabed occupancy up to 30 years in METI/MLIT designated zones
Geothermal
New baseload units
<15 MW: ¥40/kWh
≥15 MW: ¥26/kWh
<1 MW: ¥40; 1–15 MW: Formula method
≥15 MW: ¥26/kWh
15-year term; paired with JOGMEC subsurface survey and drilling cost grants
Small & Medium Hydro
<30 MW & existing conduit
Scale-tiered FIT/FIP:
~¥14 to ¥34/kWh
Scale-tiered FIT/FIP maintained
(existing-conduit & repowering tiers)
20-year term; ≥50 kW FIP-eligible for non-fossil corporate PPA bundling
Biomass
General wood, waste & liquid
Wood ≥10 MW in phase-out review;
waste/local wood tiered
General wood ≥10 MW & all liquid biomass excluded from new FIT/FIP 20-year term for retained waste/small local-wood tiers; stricter sustainability rules

The FIP Premium Formula, JEPX Capture Risk, and Balancing-Cost Evolution

Unlike a fixed-price contract-for-differences, Japan's FIP does not reimburse the exact gap between an asset's actual hourly sale price and the strike price. Understanding the monthly reference averaging mechanic is critical to equity underwriting.

Under ANRE's settlement rules, an FIP generator receives two separate cash streams: actual wholesale or bilateral electricity sales (plus Non-Fossil Certificate revenue), and a monthly FIP premium administered by OCCTO. The statutory premium unit price (premium tanka) follows a four-part equation fixed monthly around an annual baseline:

Statutory FIP Premium Equation (METI / ANRE)

FIP Premium (¥/kWh) = Reference Price (Kijun Kakaku) − [ Reference Market Price + Non-Fossil Value Equivalent − Balancing Cost Allowance ]

When the bracketed net market benchmark equals or exceeds the Reference Price in a high-price period, the FIP premium floors at ¥0/kWh (no clawback of upside wholesale revenues).

Two subtle pricing mechanics create basis divergence between modeled FIP benchmarks and realized project cashflows. First, the Reference Market Price is anchored to prior-year JEPX Day-Ahead and Intraday market prices weighted by regional technology generation profiles, updated monthly using actual spot market spreads. If an individual plant sits in a congested price zone (such as Kyushu during midday spring solar peaks, where JEPX area prices routinely compress to ¥0.01/kWh while national or regional monthly averages sit higher), the project's actual captured JEPX revenue can lag the Reference Market Price used to deduct the premium. Conversely, assets that shift dispatch into evening scarcity hours via co-located storage outperform the flat solar Reference Market Price and retain 100% of that positive spread.

Second, METI deliberately revised the Balancing Cost Allowance (baranshingu kosuto) after early FIP uptake stalled. When FIP launched in FY2022, METI set the balancing allowance at ¥1.00/kWh on a shrinking calendar glide path (−¥0.05/kWh per year in Years 1–3, then −¥0.10/kWh per year toward a ~¥0.30/kWh long-run floor). Developers found that shrinking Year-1 allowances left new projects exposed to 30-minute imbalance charges and aggregator fees. In FY2024, METI shifted to a cohort-based rule: every newly commissioned project enters at ¥1.00/kWh in Year 1 before tapering over its operating life. For FY2026, METI reinforced that commitment by embedding a full ¥1.00/kWh Year-1 balancing allowance into the FY2026 solar framework (raising the FY2026 ground-mounted benchmark to ¥9.60/kWh from the ¥8.68–¥8.90/kWh FY2025 levels), financed through the public levy savings generated by shifting curtailment order from FIP to FIT plants.

Illustrative Settlement Component (¥/kWh) Spring Midday Suppression (Kyushu/Chugoku) Balanced Shoulder Month (Base Case) Winter/Summer Peak Scarcity Month
1. METI Reference Price (FY2026 Solar) ¥9.60 ¥9.60 ¥9.60
2. Reference Market Price (Profile-Weighted JEPX) ¥5.80 ¥8.40 ¥11.80
3. Non-Fossil Value Equivalent Deduction ¥0.40 ¥0.40 ¥0.40
4. Balancing Cost Allowance (Year 1 FY2026 COD) −¥1.00 (added back) −¥1.00 (added back) −¥1.00 (added back)
5. Calculated FIP Premium [1 − (2 + 3 − 4)] ¥4.40 ¥1.80 ¥0.00 (floored)
6. Actual Asset JEPX + NFC Sales ¥4.90 (basis drag) ¥8.80 (at benchmark) ¥12.40 (full upside kept)
7. Less: Aggregator Fee & 30-Min Imbalance Cost −¥0.75 −¥0.65 −¥0.70
Net Realized Equity Revenue (5 + 6 + 7) ¥8.55/kWh ¥9.95/kWh ¥11.70/kWh

Note: Illustrative sensitivity model anchored to METI FY2026 ¥9.60/kWh solar benchmark and ¥1.00/kWh Year-1 balancing allowance. Actual monthly Reference Market Prices and NFC values vary by regional TSO area and ANRE monthly disclosures.

Curtailment Priority Dispatch, Telemetry Rules, and Co-Located BESS vs. LTDA

Curtailment exposure is no longer confined to Kyushu. METI's dispatch queue overhaul turns FIP status and battery co-location into primary physical risk-mitigation tools.

All new solar and wind certifications in Japan operate under the uncompensated and unlimited curtailment rule, meaning General Transmission and Distribution Operators (TSOs) do not reimburse generators for output throttled during grid oversupply or thermal-minimum constraints. While curtailment initially centered on Kyushu Electric Power's service territory, multi-megawatt curtailment expanded across Shikoku, Chugoku, Tohoku, Hokkaido, and even the TEPCO (Tokyo) service area during spring 2025 and spring 2026 as midday solar output collided with mild seasonal demand and restarting nuclear baseload capacity.

To reward market-responsive assets and curb surcharge inflation, METI enacted a landmark priority dispatch reform rolling out across FY2026 and FY2027 as TSO dispatch software upgrades complete. Under the revised merit order, FIT facilities are curtailed before FIP facilities. Because FIP generators remain exposed to wholesale price signals and scheduling discipline, shielding them behind FIT plants in the curtailment stack materially improves annual capacity factors for both greenfield FIP projects and legacy FIT assets exercising voluntary FIP conversion. Operationally, projects must also evaluate telemetry status: online-controlled plants receive automated 30-minute or real-time SCADA throttling instructions proportionally, whereas offline plants without automated TSO links face coarse full-day calendar-block shutoffs that amplify lost revenue.

Co-locating a Battery Energy Storage System (BESS) behind an FIP meter unlocks three direct operational advantages. First, METI permits FIP-accredited facilities to charge co-located BESS from either the on-site renewable array or the grid, provided dedicated sub-metering isolates grid-imported electricity so FIP premiums are paid strictly on net certified renewable output. Second, storing curtailed midday MWh and discharging during evening JEPX peak windows (16:00–20:00) converts ¥0.01/kWh midday curtailment risk into ¥15–¥25/kWh evening peak arbitrage without forfeiting the FIP Reference Price calculation. Third, fast BESS ramping absorbs cloud-transient solar forecast errors, compressing 30-minute imbalance charges below the ¥1.00/kWh balancing allowance.

FIP + Co-Located BESS

Ideal for utility solar (≥50 kW / ≥250 kW) and onshore wind developers seeking curtailment capture, JEPX evening spread retention, and corporate Virtual PPA delivery. Retains 100% of wholesale upside above the Reference Price and full Non-Fossil Certificate monetization without capacity-market clawbacks.

Standalone BESS via OCCTO LTDA

OCCTO's Long-Term Decarbonization Power Source Auction (LTDA) awards 20-year fixed capacity contracts to standalone grid-scale BESS (≥10 MW) and zero-emission firm assets, but requires returning roughly 90% of net energy/balancing market margins above fixed cost baselines back to the capacity settlement pool.

Legacy FIT Voluntary Conversion

Operating FIT plants with high historical curtailment rates or corporate buyer demand can convert to FIP at their existing FIT strike price (remaining years preserved). Conversion unlocks FIT-before-FIP dispatch protection, NFC transfer rights, and co-located BESS time-shifting.

Virtual PPAs, Non-Fossil Certificates, and April 2024 Statutory Gates

FIP's rapid adoption by global technology, semiconductor, and logistics off-takers in Japan rests on attribute unbundling, while post-2024 METI compliance rules impose strict governance gates on project equity.

Under FIT, environmental attributes are stripped from the generator and auctioned separately as FIT Non-Fossil Certificates to offset consumer surcharges. Under FIP, the generator retains title to its Non-Fossil Certificates (Non-FIT NFCs). This legal distinction underpins Japan's corporate PPA expansion through two structures:

At the development and asset-management level, equity sponsors must navigate two mandatory statutory regimes enforced by METI and OCCTO. First, the April 1, 2024 Amended Renewable Energy Act (enacted via the GX Decarbonization Electricity Act) requires developers of projects ≥50 kW (and specified hillside, forestry, or hazard-zone ground-mounted arrays) to conduct formal local resident briefing sessions and submit prior municipal notifications before METI issues an initial FIP/FIT certification or approves major amendments such as land-lot additions, capacity changes, or sponsor ownership transfers. If a certified operator breaches plan obligations or fails ongoing compliance standards, METI can direct OCCTO to withhold and escrow FIP/FIT payments into a statutory suspension reserve (kofukin sotogaku tsumitatekin seido) until cured, or revoke certification altogether.

Second, under the July 2022 Mandatory Decommissioning Reserve System, every FIT and FIP solar facility of 10 kW or more (including legacy assets certified prior to 2022) must accumulate end-of-life dismantling and disposal funds through an external reserve administered by OCCTO's Renewable Energy Business Integration System. Deductions begin in Year 11 and run across the final 10 years of the 20-year support window, withheld directly from monthly FIT or FIP settlements. Equity models must treat Years 11–20 cash distributions net of OCCTO reserve withholding, recognizing that accumulated funds are released only after verified panel dismantling and waste-manifest completion.

Equity Underwriting & Pipeline Diligence Priorities

Key commercial and engineering risk controls for infrastructure funds, IPPs, and corporate procurement teams evaluating Japanese FIP assets in 2026.

1. FY2026 Ground-Mount Cutoff Diligence

Verify whether ground-mounted solar pipelines (≥10 kW) hold complete grid-connection agreements, local resident briefing records, and METI ID applications ahead of the FY2027 statutory exclusion. Uncertified ground-mounted land parcels entering 2027 must underwrite strictly on unsubsidized corporate PPAs or merchant JEPX economics.

2. Capture-Rate & Aggregator Spreads

Model regional JEPX hourly capture discounts against ANRE's monthly Reference Market Price rather than assuming flat parity. Stress-test aggregator balancing fees and 30-minute imbalance charges as the Year-1 ¥1.00/kWh balancing allowance tapers in later operating years.

3. Second-Decade Reserve & BESS Sizing

Deduct OCCTO's Years 11–20 external decommissioning reserve withholding from distributable equity cashflows, and size co-located BESS duration (2–4 hours) using site-specific TSO curtailment curves and verified LCOS storage benchmarks.

Executive Regulatory Q&A

What capacity threshold makes FIP mandatory for solar projects in Japan in FY2026?
From FY2026, METI expanded mandatory FIP coverage for solar PV down from 250 kW to 50 kW and above. Projects from 50 kW to under 250 kW enter non-auction FIP (or rooftop staircase rules where eligible), while ground-mounted solar at 250 kW and above must compete in FIP auctions capped at 9.60 yen/kWh in FY2026.
How does METI calculate the monthly FIP premium from JEPX prices and balancing costs?
ANRE calculates the FIP premium unit price as Reference Price minus (Reference Market Price plus Non-Fossil Value Equivalent minus Balancing Cost Allowance). Because the balancing cost allowance is subtracted inside the bracket, it increases the net premium paid to offset aggregator scheduling and imbalance exposure.
Why are ground-mounted solar developers treating FY2026 as a hard cutoff?
METI confirmed in its March 2026 procurement decision that ground-mounted commercial solar of 10 kW and above will be excluded from new FIT and FIP certification starting in FY2027. Projects seeking levy-backed support must secure FY2026 certification or auction awards before that statutory window closes.
How does priority dispatch reform protect FIP plants during grid curtailment?
Under METI's curtailment dispatch overhaul rolling out across FY2026 and FY2027, traditional FIT plants are placed ahead of FIP plants in the uncompensated curtailment queue. FIP facilities remain dispatched deeper into oversupply events, reducing lost generation hours compared with legacy FIT assets.
Can FIP generators sell Non-Fossil Certificates directly into corporate Virtual PPAs?
Yes. Unlike FIT electricity, where environmental attributes accrue to the surcharge offset pool, FIP generators retain their Non-Fossil Certificates (Non-FIT NFCs) and can transfer them to corporate off-takers under Virtual PPAs or sleeved off-site Physical PPAs while selling energy on JEPX.
What changed under the April 2024 community briefing and OCCTO reserve rules?
Since April 1, 2024, projects at 50 kW and above (and designated hazard-zone arrays) must hold formal local resident briefing sessions before METI grants certification or approves major site or sponsor changes. Separately, solar facilities at 10 kW and above face mandatory external decommissioning reserve deductions via OCCTO during Years 11 to 20.

Official Japanese Government & Market Registry References

All statutory rates, capacity thresholds, surcharge budgets, and settlement rules are anchored directly to primary Japanese ministerial and grid-operator filings reviewed November 2026.

Regulatory Verification & Primary Basis

Every statutory status, yen-per-kilowatt-hour rate, capacity threshold, and compliance deadline in this briefing is verified directly against primary METI press determinations, ANRE ministerial orders, OCCTO system manuals, and JEPX market rules. ESI separates enacted statutory obligations from asset-level commercial underwriting assumptions.

Primary-Source AnchoringRates and thresholds reflect METI's March 21, 2025 (FY2025) and March 19, 2026 (FY2026) Procurement Price Calculation Committee determinations alongside April 2024 Amended Renewable Energy Act enforcement guidelines.
Underwriting & Diligence ProtocolBefore capital commitment or PPA execution, sponsors should confirm regional TSO priority-dispatch rollout dates, site-level resident briefing sign-off, and OCCTO external reserve schedules with qualified Japanese regulatory counsel.
Reviewed & Verified by Khaled Shawky · Chief Energy Systems & Policy Editor, Energy Solutions Intelligence Verification Cycle: November 2026