India: PM-KUSUM solar agriculture

PM-KUSUM's approved design targeted 34,800 MW by 31 March 2026 with ₹34,422 crore of central support: 10,000 MW of decentralised plants, 1.4 million standalone pumps and solarisation of 3.5 million grid-connected pumps. The dashboard continues to report sanctioned and installed quantities separately.
34,800 MW ₹34,422cr Primary sources reviewed
Primary source: MNRE - PM-KUSUM scheme. Verified Nov 2026.
Capacity target
34,800 MW
Approved design.
Central support
₹34,422cr
Including agency charges.
Standalone pumps
1.4m target
Component B.
Grid pumps
3.5m target
Component C.

Institutional Regulatory Summary

Mechanism Status Authority Effective Window Key Threshold
India: PM-KUSUM solar agriculture
Tax Credits & Subsidies
Enacted / Active Statutory Basis MNRE Active 2026 Cycle (Verify Current Gazette) Capacity target: 34,800 MW · Central support: ₹34,422cr

Regulatory Scope, Execution & Underwriting Limits

Institutional regulatory summary anchored directly to primary legislation, official gazettes, and issuing-authority filings for investment committees, project-finance teams, and corporate directors.

Statutory & Commercial Scope

Central assistance is generally up to 30% or 50% for eligible pump projects depending on location and rules. State tendering, farmer contribution and financing complete the package.

Capital Allocation & Diligence Lens

A programme envelope, target, tender, award and operating project are different stages. Current issuing-authority documents control.

Investment & Underwriting Caveats

The page corrects old pump totals and avoids treating scheme targets or sanctions as completed installations. Project-finance models should underwrite fiscal support strictly against enacted statutory text, domestic-content or prevailing-wage adders, transferability rules, and appropriation sunset dates rather than headline programme envelopes.

Executive Regulatory Q&A

Does this policy automatically fund an individual project?
No. Eligibility, selection, contracting and continuing compliance remain project-specific.
Are returns or emissions savings guaranteed?
No. Net realized subsidy value, tax-equity pricing, and project IRR depend on statutory qualification at financial close, executed offtake terms, financing structure, and verified compliance with issuing-authority rules.
What should applicants verify?
Current eligibility, deadlines, technical standards, award documents and contracts linked below.

Official references used

Links point to the issuing government, regulator or official legislation register. Accessed and reviewed 2026-10-18.

Regulatory Verification & Primary Basis

Every statutory status, threshold, and compliance boundary in this briefing is anchored directly to the primary legislative registers, regulatory orders, and ministerial publications cited above. ESI maintains strict separation between enacted legal provisions and commercial projections.

Primary-Source AnchoringAll programme parameters, eligibility rules, and award records are verified against official issuing-authority documentation rather than secondary press estimates.
Underwriting & Diligence ProtocolBefore capital deployment or financial close, funds and project sponsors should confirm active statutory windows, transitional grandfathering rules, and site-specific legal/tax counsel sign-off.
Reviewed & Verified by Khaled Shawky · Lead Energy Policy & Infrastructure Analyst, Energy Solutions Intelligence Verification Cycle: November 2026