Tax Credits & Subsidies · Brazil · Updated Nov 2026

Brazil Law 14.300: SCEE Net-Billing & 2026 Fio B

Brazil does not pay a cash feed-in tariff (Einspeisevergütung) for exported solar power. Instead, Law nº 14.300/2022 governs the Electric Energy Compensation System (SCEE), an energy-credit net-billing framework where grid-injected surplus kilowatt-hours offset consumption bills minus progressive distribution wire charges (60% of TUSD Fio B in 2026, rising to 75% in 2027 and 90% in 2028) and stricter rules for >500 kW remote plants.
Law 14.300/2022 & Law 15.269/2025 60% Fio B in 2026 (GD II) REIDI for BESS 2026–2030
Primary statutes: Law 14.300/2022 (Planalto) · Law 15.269/2025 (Planalto). Verified Nov 2026.
2026 GD II Wire Charge
60% Fio B
Art. 27 escalation (75% in 2027, 90% in 2028).
GD I Grandfathering
Dec 31, 2045
Filings ≤ Jan 7, 2023 meeting commissioning windows.
GD III (>500 kW Remote)
100% + 40%
100% Fio B + 40% Fio A + TFSEE/P&D until 2028.
Fast-Track Exemption
≤7.5 kW / Grid 0
ANEEL REN 1.098/2024 Art. 73-A study waiver.

Statutory Architecture & 2026 Regulatory Matrix

Institutional reference across Brazil's primary distributed-generation statute, ANEEL grid-access rules, and the late-2025 power-sector reform laws governing 2026 capital deployment.

Mechanism Status Authority Effective Window Key Threshold
Law 14.300/2022, Art. 26 (GD I Legacy)
Full SCEE Volumetric Compensation
Grandfathered / Closed to New Filings Presidência da República / ANEEL Filed ≤ Jan 7, 2023; protected through Dec 31, 2045 Commissioning within 120d (micro), 12m (solar mini), 30m (other); up to 5 MW
Law 14.300/2022, Art. 27 (GD II Transition)
Escalating Fio B Net-Billing
Active (Year 4 of 6) ANEEL / Distributors Jan 8, 2023 – Dec 31, 2028 (Art. 17 valuation in 2029) 60% Fio B in 2026; ≤75 kW micro; ≤3 MW solar mini (non-dispatchable)
Law 14.300/2022, Art. 27 § 1º (GD III)
Large Remote & Concentrated Shared
Active / Full Wire Incidence ANEEL Through Dec 31, 2028 (Art. 17 valuation in 2029) >500 kW non-dispatchable remote or ≥25% single-member shared: 100% Fio B + 40% Fio A + TFSEE/P&D
ANEEL REN 1.059/2023 & REN 1.098/2024
Reverse Power Flow & TUSDg Rules
Enforced (REN 1.000/2021) ANEEL Active 2023–2026+ Art. 73-A waives reverse-flow study for Grid Zero and ≤7.5 kW local fast-track
Law 15.269/2025 (MP 1.304) & Law 15.235/2025
BESS REIDI, CDE-GD & ACL Reform
Enacted Oct–Nov 2025 Presidência da República / MME REIDI for BESS: Jan 1, 2026 – Dec 31, 2030 Preserves SCEE Fio B schedule; broadens CDE-GD sharing; formalizes ANEEL BESS oversight

No Cash Feed-In Tariff: How Brazil's SCEE Net-Billing Works

European developers and family offices searching for a Brazilian Einspeisevergütung frequently misprice project cash flows by assuming utility cash purchases of exported solar generation. Brazilian law prohibits direct retail cash sales inside the regulated distributed-generation regime.

1. Energy Credits, Never Cash Payouts

Under Law nº 14.300, of January 6, 2022 and ANEEL Normative Resolution 1.000/2021 (as amended by REN 1.059/2023), surplus electricity injected into the distributor network enters the Sistema de Compensação de Energia Elétrica (SCEE). Each kilowatt-hour injected generates an energy credit valid for 60 months. Utilities settle those credits exclusively against active electricity consumption on the owner's meter or registered beneficiary meters, never by issuing cash wires for excess exports.

2. Four Statutory Offtake Modalities

SCEE credits can be monetized across four legal configurations: local self-consumption (behind-the-meter generation at the site), remote self-consumption (autoconsumo remoto, offsetting other meters under the same CPF/CNPJ within the same distributor concession), shared generation (geração compartilhada via consortium, cooperative, civil condominium, or partnership), and EMUC (multi-unit residential or commercial condominiums).

3. Capacity Boundaries: 75 kW, 3 MW, and 5 MW

Article 1 defines microgeneration at up to 75 kW AC installed capacity. Minigeneration spans above 75 kW up to 3 MW for non-dispatchable sources (standard solar PV and wind) and up to 5 MW for dispatchable sources (hydropower, cogeneration, biogas, biomass, and solar paired with qualifying storage/dispatch thresholds). Legacy GD I plants filed by January 7, 2023 retain the higher 5 MW non-dispatchable cap through 2045 under Article 26's sole paragraph.

Fio B Escalation Schedule: GD I vs. GD II vs. GD III (>500 kW)

The economic divider across Brazilian distributed-generation portfolios is not module cost; it is which transition tier in Articles 26 and 27 applies to the plant's interconnection filing date and ownership concentration.

Billing Year GD I Legacy (Art. 26)
Filed ≤ Jan 7, 2023
GD II Standard (Art. 27)
Filed > Jan 7, 2023 (≤500 kW or Local)
GD III Large Remote / Concentrated (Art. 27 § 1º)
>500 kW Remote or ≥25% Single Holder
Instantaneous Behind-the-Meter
Consumed On-Site Without Grid Export
2023 0% Fio B (Full Offset) 15% of TUSD Fio B on compensated kWh 100% Fio B + 40% Fio A + TFSEE & P&D 0% Wire Charges (Never touches grid)
2024 0% Fio B (Full Offset) 30% of TUSD Fio B on compensated kWh 100% Fio B + 40% Fio A + TFSEE & P&D 0% Wire Charges (Never touches grid)
2025 0% Fio B (Full Offset) 45% of TUSD Fio B on compensated kWh 100% Fio B + 40% Fio A + TFSEE & P&D 0% Wire Charges (Never touches grid)
2026 (Current) 0% Fio B (Protected to 2045) 60% of TUSD Fio B on compensated kWh 100% Fio B + 40% Fio A + TFSEE & P&D 0% Wire Charges + 0% Energy Taxes
2027 0% Fio B (Protected to 2045) 75% of TUSD Fio B on compensated kWh 100% Fio B + 40% Fio A + TFSEE & P&D 0% Wire Charges + 0% Energy Taxes
2028 0% Fio B (Protected to 2045) 90% of TUSD Fio B on compensated kWh 100% Fio B + 40% Fio A + TFSEE & P&D 0% Wire Charges + 0% Energy Taxes
2029 – 2045 0% Fio B until Dec 31, 2045 (Group A pays TUSDg) Art. 17 Valuation Rule (Costs minus ANEEL-valued DG benefits) Art. 17 Valuation Rule (Starts 2029 alongside GD II) 0% Wire Charges (Permanent physical bypass)

GD I Commissioning Cliff & Asset Premium

Filing an access request by January 7, 2023 was only the first hurdle for GD I status. Under Article 26, § 3º of Law 14.300/2022, sponsors had to inject initial energy within strict deadlines measured from issuance of the distributor's Parecer de Acesso: 120 days for microgeneration, 12 months for solar minigeneration, and 30 months for non-solar minigeneration.

In secondary M&A across Minas Gerais, São Paulo, and Mato Grosso, operational GD I remote plants trade at substantial valuation multiples over newly built GD II plants because their volumetric energy credits bypass the 60% to 90% Fio B deduction through December 31, 2045. Diligence teams must verify distributor commissioning certificates, unchanged AC power capacity, and uninterrupted meter title continuity, as unauthorized capacity expansions forfeit GD I grandfathering on the incremental tranche.

Why GD III (>500 kW) Forces Shared-Ownership Structuring

Under Article 27, § 1º, any post-deadline non-dispatchable plant above 500 kW operating in autoconsumo remoto, or in geração compartilhada where a single consumer unit or holder concentrates 25% or more of surplus credits, forfeits the gradual 2023–2028 phase-in. Instead, it immediately pays 100% of TUSD Fio B, 40% of TUSD Fio A (transmission/subtransmission charges), and 100% of TFSEE and P&D levies until 2028.

Consequently, institutional developers routinely cap single remote-plant tranches at ≤500 kW (or structure shared-generation consortiums where no single corporate offtaker exceeds 24.9% allocation) to preserve GD II transitional economics, or else evaluate migrating >500 kW commercial loads directly into Brazil's Free Contracting Environment (ACL) under Law 15.269/2025.

Power Flow Reversal (Inversão de Fluxo) & ANEEL REN 1.098/2024

Even when tariff math works, physical grid access became Brazil's sharpest execution bottleneck between 2023 and 2026 as distributors invoked reverse power flow to block new solar interconnections.

When ANEEL issued Normative Resolution nº 1.059/2023 to operationalize Law 14.300, it revised Article 73 of REN 1.000/2021, requiring distribution utilities to evaluate whether a proposed micro or minigenerator creates inversão de fluxo de potência (reverse power flow) at the distribution transformer or feeder circuit breaker. Across saturated feeders in concessions operated by Cemig, Equatorial, Enel, Energisa, and CPFL, utilities rejected thousands of connection requests or conditioned approval on multi-million-real substation upgrades, dynamic injection caps, or voltage-level migration.

To curb arbitrary rejections and restore auditability, ANEEL enacted Normative Resolution nº 1.098/2024 (published July 31, 2024), inserting Article 73-A into REN 1.000/2021. The rule forced distributors to disclose feeder hosting-capacity calculations in standardized technical studies and created three binding exemptions from reverse-flow study blocks that govern 2026 project engineering:

Regulatory Rule / Tax Regime Governing Instrument 2026 Operational Scope Commercial & Engineering Impact
Grid Zero (Zero-Export Exemption) ANEEL REN 1.098/2024 (Art. 73-A, REN 1.000/2021) Systems configured with certified reverse-power relays preventing active injection to grid Exempts C&I rooftop/ground plants of any DG size from reverse-flow rejections; ideal when paired with BESS
Fast-Track ≤7.5 kW Self-Consumption ANEEL REN 1.098/2024 (Art. 73-A, REN 1.000/2021) Microgeneration ≤7.5 kW where owner waives remote credit allocation to other meters Unlocks residential and small-business approvals without feeder-capacity delays
Group A TUSDg Billing Law 14.300/2022 Art. 18 & REN 1.059/2023 Medium/high-voltage minigeneration (>75 kW) billed on contracted generation demand (MUSD) Replaces punitive load-demand tariff on injected capacity; GD I plants enter TUSDg after first tariff review
ICMS Exemption on Energy Offset CONFAZ Convênio ICMS 16/2015 Authorizes states to exempt ICMS on kWh compensated via SCEE (TE portion) State ICMS still applies to non-exempt 60% Fio B wire charge in 2026 in most jurisdictions
PIS/COFINS Zero Rate Law 13.169/2015, Art. 8º 0% federal PIS/Pasep and COFINS on compensated active energy kWh Preserved alongside Convênio ICMS 16/2015, while wire charges remain taxable
BESS REIDI Tax Waiver Law 15.269/2025 (converting MP 1.304/2025) Suspends PIS/COFINS on eligible battery storage CAPEX from Jan 1, 2026 to Dec 31, 2030 Lowers upfront BESS capital expenditure; subject to annual federal fiscal-waiver caps

MP 1.300, Law 15.269/2025 (MP 1.304), and the 2029 Art. 17 Valuation

Between May and November 2025, two Provisional Measures tested the durability of Law 14.300/2022. Understanding what Congress enacted versus what it rejected is essential for underwriting 2026–2030 distributed assets.

MP 1.300/2025 → Law 15.235/2025

Issued in May 2025, Provisional Measure 1.300 initially included open-ended tariff-design authority that distributed-solar associations (ABSOLAR and ABGD) warned could enable retroactive multipart or binomial wire fees on Group B rooftop owners. Following intense congressional pushback, lawmakers excised the controversial low-voltage tariff provisions. Signed on October 8, 2025, Law nº 15.235/2025 focused on expanding the Tarifa Social de Energia Elétrica (100% bill exemption up to 80 kWh/month for CadÚnico households) and CDE subsidy adjustments.

MP 1.304/2025 → Law 15.269/2025

Enacted on November 24, 2025, Law nº 15.269/2025 modernized Brazil's power framework while explicitly preserving Law 14.300's SCEE compensation and Fio B schedule for existing and transitional DG plants. Key structural shifts include broadening CDE-GD subsidy cost sharing across both regulated and free-market (ACL) consumers, establishing statutory timelines for full retail ACL liberalization, creating a Supplier of Last Resort (SUI), defining curtailment compensation rules, and granting ANEEL explicit authority over Battery Energy Storage Systems (BESS) with REIDI tax suspension for 2026–2030.

2029 Cliff: Art. 17 & CNPE Res. 2/2024

For all GD II and GD III systems, the 90% Fio B cap ends on December 31, 2028. Starting in 2029, Article 17 subjects SCEE participants to full non-energy wire and sectoral tariffs, offset by ANEEL's calculated value of DG system benefits (avoided transmission/distribution expansion, lower technical losses, locational relief, and capacity adequacy). CNPE Resolution nº 2/2024 set the binding policy guidelines, and ANEEL opened Tomada de Subsídios nº 23/2025 to prepare the mathematical methodology for consolidation ahead of 2029.

Underwriting 2026 Cash Flows: BESS Pairing, Group A TUSDg, and Equity Economics

As Fio B climbs from 60% in 2026 to 90% in 2028, grid-export economics compress. Institutional sponsors protect unlevered equity IRR by shifting from pure kWh export volume toward instantaneous load matching and storage arbitrage.

In Group B (low-voltage residential and small commercial tariffs), every kilowatt-hour consumed directly behind the meter during solar hours avoids 100% of the bundled retail tariff (TE + full TUSD + ICMS + PIS/COFINS + public lighting/bandeira surcharges), whereas every exported kilowatt-hour in 2026 loses 60% of TUSD Fio B plus associated state taxes upon compensation. In concessions with high Fio B components (frequently 25% to 35% of the all-in Group B tariff), raising instantaneous self-consumption from 35% to 75% through daytime industrial scheduling, HVAC/chiller thermal pre-cooling, or behind-the-meter LFP battery dispatch shields unlevered project cash flows far more effectively than oversizing PV arrays for export.

In Group A (medium and high-voltage industrial and agribusiness facilities), project sponsors must model two separate rate periods (horário de ponta peak vs. fora de ponta off-peak) alongside TUSDg demand billing and power-factor penalties. Because solar generation peaks during off-peak hours while Group A tariffs penalize evening peak consumption heavily, standalone PV leaves peak demand charges untouched. Pairing PV with behind-the-meter BESS enables peak-shaving during the distributor's 3-hour evening peak window, eliminates reverse-flow curtailment under REN 1.098/2024 Art. 73-A (Grid Zero), and captures REIDI CAPEX tax relief enacted under Law 15.269/2025.

On the supply-chain side, sponsors must also model Brazilian customs duties on imported equipment. Following CAMEX tariff restorations under Brazil's Ecological Transformation Plan, assembled solar modules carry import tariff exposure where local equivalence or ex-tarifário quotas expire; see our companion dossier on Brazil's solar-module import tariff alongside our Solar Output Calculator and LCOS Storage Cost Modeler when calibrating Capex-per-watt against 2026 Fio B drag. For large remote portfolios (>500 kW), sponsors increasingly benchmark GD III net-billing returns against direct bilateral physical PPAs in Brazil's liberalizing Free Market (ACL), avoiding SCEE credit lock-in and distributor reverse-flow queues entirely.

GD I Secondary Acquisitions

Audit original Parecer de Acesso dates (≤ Jan 7, 2023), commissioning proof within 120d/12m/30m statutory windows, and inverter AC limits to confirm 2045 grandfathering integrity before deploying equity.

GD II Shared-Generation Leases

Keep single-offtaker participation strictly below 25% on plants >500 kW, enforce contractual step-ins for Fio B escalations (60% → 75% → 90%), and diversify subscriber churn across creditworthy commercial SMEs.

C&I Grid-Zero PV + BESS

Bypass saturated distributor feeders via REN 1.098/2024 Art. 73-A export-limiting controllers, monetize REIDI tax relief on storage hardware (2026–2030), and size LFP capacity for evening Group A peak shaving.

Executive Regulatory Q&A

Does Brazil pay a cash feed-in tariff (Einspeisevergütung) for solar electricity?
No. Brazil does not pay a European-style cash feed-in tariff per kilowatt-hour exported to the grid. Instead, Law 14.300/2022 governs the Electric Energy Compensation System (SCEE), an energy-credit net-billing model where surplus kWh exported to the local utility generate volumetric energy credits valid for 60 months to offset consumption on the same meter or qualifying remote units, minus non-exempt distribution wire charges (Fio B).
What is the TUSD Fio B charge for new Brazilian solar projects in 2026?
Under Article 27 of Law 14.300/2022, standard post-deadline projects (GD II, filed after January 7, 2023) pay 60% of the TUSD Fio B distribution wire component on every kilowatt-hour injected into the grid and compensated as credit during calendar year 2026. That share rises to 75% in 2027, 90% in 2028, and transitions to ANEEL's Article 17 cost-benefit valuation methodology in 2029.
How do GD I, GD II, and GD III (>500 kW) rules differ under Law 14.300/2022?
GD I covers systems existing or filed by January 7, 2023 that met commissioning deadlines (120 days micro, 12 months solar mini, 30 months non-solar mini) and preserves full volumetric compensation until December 31, 2045. GD II applies the 15%-to-90% Fio B phase-in through 2028. GD III (Article 27, paragraph 1) covers non-dispatchable plants above 500 kW in remote self-consumption or concentrated shared generation (≥25% single beneficiary), which pay 100% of Fio B, 40% of Fio A, and 100% of TFSEE and P&D charges on compensated energy through 2028.
How can developers avoid distributor rejections for power flow reversal (inversão de fluxo)?
Under ANEEL Normative Resolution 1.098/2024 (Article 73-A of REN 1.000/2021), distributors must waive reverse-flow technical studies for three categories: zero-export (Grid Zero) systems configured not to inject energy into the distribution grid, fast-track local self-consumption systems up to 7.5 kW where the owner waives remote credit transfers, and qualifying low-income installations matching daytime load.
Did Law 15.235/2025 (MP 1.300) or Law 15.269/2025 (MP 1.304) cancel Law 14.300's Fio B transition?
No. Congress stripped disruptive low-voltage tariff restructuring clauses from MP 1.300/2025 before enacting Law 15.235/2025 on Social Tariff expansion. Law 15.269/2025 (converting MP 1.304/2025) preserved Law 14.300's SCEE credit rules and Fio B schedule, while broadening CDE-GD cost sharing across the free market (ACL), scheduling full retail market liberalization, and extending REIDI tax incentives to battery storage (BESS) from 2026 through 2030.
Do ICMS, PIS, and COFINS apply to compensated solar energy in Brazil?
Instantaneous behind-the-meter self-consumption avoids distribution grid billing entirely, incurring zero Fio B, ICMS, PIS, or COFINS. For energy injected and compensated through the grid, Law 13.169/2015 (Article 8) zero-rates PIS/COFINS and CONFAZ Convênio ICMS 16/2015 authorizes state ICMS exemptions on the compensated energy commodity, while normal taxes apply to the non-exempt Fio B (and GD III Fio A/TFSEE/P&D) wire charges.

Official Statutory & Regulatory Registers

All statutory citations, percentages, commissioning deadlines, and 2025–2026 amendments are verified directly against official Brazilian legislation and ANEEL regulatory registers as of November 2026.

Regulatory Verification & Primary Basis

Every statutory status, tariff phase-in, commissioning deadline, and reverse-flow waiver in this briefing is anchored directly to the Presidência da República legislative register and ANEEL Normative Resolutions cited above. ESI maintains strict separation between enacted legal provisions and commercial IRR projections.

Primary-Source AnchoringAll Fio B escalation rates (60% in 2026), GD I grandfathering windows, GD III >500 kW wire charges, and 2025 reform conversions (Law 15.235 and Law 15.269) are verified directly against official Planalto and ANEEL publications rather than secondary aggregator commentary.
Underwriting & Diligence ProtocolBefore capital deployment, sponsors should verify distributor-specific Fio B tariff values in ANEEL's homologatory resolutions, state-level ICMS Convênio 16/2015 adherence, feeder hosting-capacity filings, and site-specific legal/tax counsel sign-off.
Authored & Verified by Khaled Shawky · Chief Energy Systems & Policy Editor, Energy Solutions Intelligence Verification Cycle: November 2026