A hybrid STATCOM that integrates a supercapacitor bank and a small electrolyzer to provide both fast reactive power support and long-duration active power buffering, enabled by SiC inverters and AI predictive control.
The original 2005 patent proposed a STATCOM with a battery energy storage system (BESS) to provide active power support. However, at that time, battery technology (lead-acid and early Li-ion) had limited cycle life, high cost, and slow response. The power electronics (IGBTs) had high switching losses and limited voltage/current ratings, making the system bulky and inefficient. Moreover, the control algorithms were not advanced enough to handle the complex grid dynamics, leading to poor performance and economic infeasibility.
Use a hybrid buffer: a bank of supercapacitors for fast (millisecond) reactive and active power support, and a small PEM electrolyzer to absorb excess energy and produce hydrogen for long-duration storage. Advanced SiC MOSFETs reduce switching losses and enable higher switching frequencies, shrinking the inverter size. AI-based predictive control optimizes the use of supercapacitors and electrolyzer based on grid forecasts, extending component life and improving economic returns.
Interactive ROI Simulator
Adjust annual production volume to estimate ROI and Profit.
- SiC MOSFET-based VSC (2 MW)Core power conversion for reactive and active power control
- Supercapacitor bank (5 MJ)Fast active power buffer for grid disturbance mitigation
- PEM electrolyzer (500 kW)Long-duration energy absorption and hydrogen production
- Hydrogen storage tank (200 kg)Store hydrogen produced by electrolyzer
- AI predictive controller (industrial edge computer)Optimize power flow and component usage based on grid forecasts
- High-frequency transformerIsolation and voltage matching for electrolyzer and supercapacitor
- Thermal management system (liquid cooling)Maintain optimal temperature for SiC devices and electrolyzer